Description
Remove and haul out existing tile to expose rotten subfloor
Replace subfloor with new OSB for increased structural integrity of floor before installing new flooring.

Remove and haul out existing tile to expose rotten subfloor
Replace subfloor with new OSB for increased structural integrity of floor before installing new flooring.